“Friendship, love, health, energy, enthusiasm, and joy
are the things that make life worth living and exploring.” ~ Denise Austin

Tuesday, September 8, 2020

To-Do Tuesday #34

 My 34th week of linking to Home Sewn By Us for To-Do Tuesday

Here is the list from last week

To-Do Tuesday week of September 1 through September 7:
  1. Continue hand quilting the mini Beatrix Potter quilt 3 crazy sisters yes
  2. Scrappy rectangle sashing yes
  3. FMQ practice 4 days yes
  4. Scrappy around the cabin blocks....join more together yes
I talked about three projects in my blog post 2 days ago with photos...
the Beatrix Potter mini, the dolphin runner and #20 Stitch Meditation.

I did some FMQ with my BSR and used designs I saw on Craftsy and IG by Christina Cameli. I made a practice sandwich using 4 images from Susan Winget fabric.
Sprials.......echoed paisley...pebbles.....S shaped echoed....she calls toothpaste swirl.....bear claws and my S or L shape echoed.


AND here are some other smaller practice pieces where I followed the lines of the design and used the BSR foot and also the ruler foot with a straight ruler to do the lines. The ruler foot works much better........I just need to get used to moving everything at once.....hold the ruler in place....move the fabric....and keep the ruler foot next to the ruler AND get a consistent stitch.


Another photo of the around the cabin blocks on a batting in front of another quilt. I made little cardboard pieces in different sizes to help with checking all the sizes of the blocks....so I don't have to keep measuring each block piece. They are laying on top of each group in the photo....5½" 6" 6½"....etc....

To-Do Tuesday week of September 8 through September 14:
  1. Finish dolphin runner
  2. Work on other projects in progress..........scrappy rectangles.....around the cabin....and mini 3 crazy sisters AND my potholder FMQ practice pieces.

I am linking to Roseanne's 

and linking to Rebecca Grace  about FMQ

and linking to Free Motion Mavericks

Be sure to see what everyone else is doing and join in the fun!!

Smiles and hugs....Caryl

Sunday, September 6, 2020

Slow Sunday Stitching

 AND today I am hand stitching on THREE different projects..........

I am happily hand quilting my Beatrix Potter mini 3 Crazy Sisters quilt that I have mentioned before. This is from one of Joe Cunningham's classes on Craftsy.

I am hand quilting with the same quilting as Joe used by machine.  I am thinking I might need to do some machine quilting in the ditch along the block edges.....not sure if that would take away from the total design.  I don't want it to look blocky....more an overall design??

And I am also working on the binding on the dolphin runner and it is almost done..........

I just finished Stitch Meditation #20


I am linking to Kathy's Quilts  Slow Sunday Stitching

Be sure and check what everyone else is sewing today.

Smiles and hugs....Caryl

Tuesday, September 1, 2020

To-Do Tuesday #33

 My 33rd week of linking to Home Sewn By Us for To-Do Tuesday

Here is the list from last week

To-Do Tuesday week of August 25 through August 31:
Projects I will be working on:
  1. mini 3 crazy sisters yes
  2. contemporary log cabin yes
  3. dolphin runner yes
  4. Stitch Meditation yes
  5. scrappy around the cabin yes
I am hand quilting the mini quilt....blogged about it last blog post.  I started using a different thread and because of the difficulties I was having I changed to Aurifil #12

Stitch Meditation #19
These fabric pieces were on my cutting table and begging to be a Stitch Meditation! And it has been three months since I did my last one!! Love just letting it lead me to stitch with no plan!!

Here is a photo of the two potholders I finished........I used these as FMQ practice and have blogged about them previously. I used a decorative stitch on the Daisy potholder to use the back as a binding.....last week I had it ready to stitch and my machine was not working right. BUT all of a sudden after it was in "time out" for several days it decided to work....hee hee


To-Do Tuesday week of September 1 through September 7:
  1. Continue hand quilting the mini Beatrix Potter quilt 3 crazy sisters
  2. Scrappy rectangle sashing
  3. FMQ practice 4 days
  4. Scrappy around the cabin blocks....join more together

I am linking to Roseanne's 

Be sure to see what everyone else is doing and join in the fun!!

Smiles and hugs....Caryl

Sunday, August 30, 2020

Slow Sunday Stitching

Today I worked on two projects that are stitched by hand............

The first one is a project I started this last week and is a little mini wall hanging....

I blogged about this last Tuesday........

I was watching Joe Cunningham on Bluprint/Craftsy and decided I needed to try one of the projects...

The 3 Crazy Sister quilt was the one I chose to start........

I need a little quilt for the wall in my bathroom    next to my Beatrix Potter collection...

Soooo....I decided to use some of my Beatrix Potter fabric and I added a shiny blue fabric as an accent.

I got it together and had planned on quilting it by machine....but changed my mind and decided to hand quilt it!  I started quilting it today and took a photo....


I was having difficulty with the thread twisting and knotting and then I discovered some loops as I hadn't pullted the thread tight enough.....I finally ended up pulling out all the quilting I had done!!

AND NOW I am using 12 wt purple.....that I wanted to use to start with....but it shows more....BUT it makes me so happy.....no photos yet.

In the meantime....I was also working on binding of the dolphin runner I have blogged about previously.





I am linking to Kathy's Quilts  Slow Sunday Stitching


Be sure and check what everyone else is sewing today.

Smiles and hugs....Caryl

Tuesday, August 25, 2020

To-Do Tuesday #32

  My 32nd week of linking to Home Sewn By Us for To-Do Tuesday


Here is my progress from last week
To-Do Tuesday week of August 18 through August 24:
  1. FMQ practice and finish up some of the potholders 
  2. join together some scrappy around the cabin blocks yes
  3. Do another Stitch Meditation (zen stitching) yes
I didn't finish any potholders because my machine is not stitching correctly right now.
Here is the Daisy potholder with the clips holding the self binding ready to sew in place.
And here is a photo from my last blog post with the two sections ready to go together....The last blog post also shows the other side of the zentangle design on the outside of the fabric.

Photo of some of the blocks in my scrappy around the cabin
I have been watching some Bluprint/Craftsy classes and started two projects.  
One is a class by Judith Trager and here is the start of some of the blocks in her class that she calls contemporary log cabin.  These are blocks to practice the technique for background blocks for art quilts. These blocks are made from triangles, wedges and strips.....the photo shows the start of three blocks.
 The other Bluprint/Craftsy class is by Joe Cunningham and is called 3 Crazy Sisters.  Here are the first 5 blocks I made.  I am just making a mini quilt to hang by my Beatrix Potter collectibles.
I just wanted to try the technique........
Here is another photo of some of the pieces......

To-Do Tuesday week of August 25 through August 31:
Projects I will be working on:
  1. mini 3 crazy sisters
  2. contemporary log cabin
  3. dolphin runner
  4. Stitch Meditation
  5. scrappy around the cabin
I am linking to Roseanne's 

Be sure to see what everyone else is doing and join in the fun!!

Smiles and hugs....Caryl

Thursday, August 20, 2020

FMQ practice samples going to be potholders

 Today I am linking to two FMQ links.

I had planned on doing more for this blog post........ like actually showing some completed potholders!!.....but our A/C is not working......and we didn't think we needed to get it fixed because we can usually cool our house in the mornings and evenings.  BUT the temps have not been getting down to the 60s as usual....so our house is 85 inside with fans going!

So here is what I have.....

A zentangle design I have been wanting to stitch.


these first photos are before I trimmed.


I started by making the outside lines with a ruler.  I could see that was going to take forever....

So...I switched to my walking foot and did the design very quickly.

I trimmed the batting first by folding under the fabric and then turned it and I trimmed the outside fabric a little more than an inch from the edge.

I will join these two pieces that each have batting by bringing the jewel fabric folded to the top for a self binding.  The daisy potholder I previously blogged about using a wavy ruler.

AND I have blogged about this tomatoes potholder top.  I used a ruler foot and straight ruler and it takes a bunch of practice for straight lines.....holding the ruler and moving the ruler and moving the fabric AND trying to get a decent stitch length.  I am used to my BSR and this is a whole different thing!  I varied the width of the lines by accident and then I decided that might be a good thing!

The links to FMQ are so inspiring to see what everyone else is doing. 

Rebecca Grace  Long Arm Learning 

http://cheekycognoscenti.blogspot.com/2020/08/lal3-one-where-rebecca-finally-finishes.html

AND I am also linking with Free Motion Mavericks

https://quiltinglearningcombo.blogspot.com/2020/08/fmq-mini-on-free-motion-mavericks.html

Be sure to check their posts also.....it is so fun to see what everyone else is doing!


Smiles and hugs....Caryl

Tuesday, August 18, 2020

To -Do Tuesday #31

 My 31st week of linking to Home Sewn By Us for To-Do Tuesday


Here is my progress from last week

To-Do Tuesday for week of August 11 through August 17:
  1. Make some more scrappy around the cabin blocks yes
  2. Add horizontal sashing to scrappy rectangle blocks yes
  3. FMQ practice 4 days yes
  4. Work on dolphin runner hand binding yes
  5. Online class lessons at least 4 days yes
I will be doing another blog post this week about FMQ practice I have done.  I will be making the practice pieces into potholders.  Here is a photo of the practice making lines with a ruler and ruler foot.  I varied the width of the space between lines and that draws your eye away from the not so perfect straight lines.....sort of...


Here are photos of our new calibrachoa we bought yesterday.  The blooms are blue, red and yellow.


To-Do Tuesday week of August 18 through August 24:
  1. FMQ practice and finish up some of the potholders 
  2. join together some scrappy around the cabin blocks
  3. Do another Stitch Meditation (zen stitching)
I am linking to Roseanne's 

Be sure to see what everyone else is doing and join in the fun!!

Smiles and hugs....Caryl

Tuesday, August 11, 2020

To-Do Tuesday #30

 My 30th week of linking to Home Sewn By Us for To-Do Tuesday


Here is my progress from last week

To-Do Tuesday for week of August 4 through August 10:
  1. Add sashing to my scrappy rectangle blocks yes
  2. Finish yellow brick road quilt yes
  3. Gather all my quilt books and put together in one place yes
  4. FMQ practice at least 4 days yes
  5. Online class lessons 4 days and complete at least one page yes
1 I got all of the vertical sashing done
2 I finished the yellow brick road quilt and did a blog post about it yesterday with LOTS of photos
3 I added another shelf unit next to the one in my sewing room for all the quilting books.  I will also have notebooks with patterns printed out and Craftsy/Bluprint class material printouts.  
I am now putting the books in A to Z order by first name of author.  AND a WORD document chart listing all of them.
4 I used my 2 rulers in FMQ practice on fabric that will be potholders.  On the straight stitching I ran out of the thread in the middle and it shows where the lines meet.  I will add lines going the other direction and hope it won't be noticed.  Trouble shooting is part of the practice....


6 I worked on my online class lessons on six different days!

To-Do Tuesday for week of August 11 through August 17:
  1. Make some more scrappy around the cabin blocks
  2. Add horizontal sashing to scrappy rectangle blocks
  3. FMQ practice 4 days
  4. Work on dolphin runner hand binding
  5. Online class lessons at least 4 days
I am linking to Roseanne's 

Be sure to see what everyone else is doing and join in the fun!!

Smiles and hugs....Caryl

Monday, August 10, 2020

Yellow Brick Road finished!

 This post is full of photos...of this quilt I just finished!

The first photo is being held and the second one is laying on the concrete.

This pattern is by Terry Atkinson of Atkinson Designs

I started it Januarry 21, 2014 and have blogged about it.  I had bought a 6 fat quarter bundle several years before I started this quilt.  I blogged about it 1/25/14 and then again 2/01/14, 2/08/14 and 6/27/14.  At that time it was a quilt top and it hung on my quilt rack for years as I did other quilts.

Then this year I decided I needed to finish it.  I used Diagonal Dots for the backing.  There are photos in 2/25/20 post of the start of FMQ.  I used designs by Lori Kennedy mostly.  The designs I used are flower power, Claire's peony, Faye's flower, Easy Peasy.  I also used wiggles, loops, heart leaves and spirals and meanders.  The first border I used lazy 8 Christina Cameli.  The outer border is #4 serpentine stitch on my machine 2.5 x 2.5.

The other blog posts with photos from this year 6/30, 7/14, 7/19 and 7/21.

Here are photos I took all over the quilt...starting at the top left and down and all around.  Since these photos are on my phone and then in my computer....they do go away....but this blog is where I can come to see them if they are gone other places!!









And the last photo is with a corner turned over to see the back.

It feels good to have this done....I had thought about giving it as a gift....but it has practice FMQ...but then that is what I usually call all my FMQ as it is hard to get it to look perfect.  OH that's right....I forgot I gave up being perfect and I am now striving to be perfectly imperfect!!!

Rebecca Grace has started a linky party and this is the second week.  She has invited me to join.

http://cheekycognoscenti.blogspot.com/2020/08/lal2-one-where-thoroughly-modern-millie.html

Be sure to check out the other posts......so many very interesting blogs to check!

AND I am also linking with Free Motion Mavericks

http://lizzielenard-vintagesewing.blogspot.com/2020/08/free-motion-mavericks-week-293-another.html

Be sure to check their posts also.....it is so fun to see what everyone else is doing!

Smiles and hugs....Caryl

Tuesday, August 4, 2020

To-Do Tuesday #29

My 29th week of linking to Home Sewn By Us for To-Do Tuesday

Here is my progress from last week

To-Do Tuesday for week of July 28 through August 3:
  1. I am in a FB quilt challenge to enter a quilt every day so I will finish those entries. yes 
  2. Document my quilts in a notebook of these 10 quilts. (Most of my information is in my blog and that is where I go whenever I need to repeat something or someone asks about a quilt.) yes
  3. Work on my ongoing quilt projects every day. yes
I worked on a quilting project every day and worked on 5 different quilt projects this week.  I also started some contemporary log cabin blocks after watching a Bluprint class by Judith Trager!

I made a decision to sash my scrappy rectangle blocks with black.  (My quilt group in a Zoom meeting thought I needed sashing.)  I took the photo to see if the placement is okay.....I have moved blocks around so many times!  The photo shows the start of the black sashing.

I also worked in my creative journal.  Instead of a page for each day I did all of July on two pages!

To-Do Tuesday for week of August 4 through August 10:
  1. Add sashing to my scrappy rectangle blocks
  2. Finish yellow brick road quilt
  3. Gather all my quilt books and put together in one place
  4. FMQ practice at least 4 days
  5. Online class lessons 4 days and complete at least one page

I am linking to Roseanne's 

Be sure to see what everyone else is doing and join in the fun!!

Smiles and hugs....Caryl

Tuesday, July 28, 2020

To-Do Tuesday #28

My 28th week of linking to Home Sewn By Us for To-Do Tuesday

Here is my progress from last week

To-Do Tuesday for the week of July 21 through July 27:
  1. Finish quilting the dolphin runner yes
  2. Make the last block of the scrappy rectangle quilt yes
  3. Do online class lessons at least 4 days yes
1  I finished quilting the dolphin runner, trimmed it and put on the binding and it is ready to hand stitch the binding to the back
2  I got the last scrappy rectangle block done and now have 12 blocks 
3  I worked on my online lessons 5 days this past week

Here is a photo of chocolate banana bars OUT of the oven.  I had posted in my hungry to lose blog about these and made them again 5 days later.  The photos in the blog are one in the pan before the oven and the other is on the plate ready to eat.

Here is the blog link if anyone wants the recipe...WW 2 points each.


We really miss going out to eat and eat all of our meals at home now.  But we do go through a drive thru and pick up food once in awhile.  We usually bring it home.  This last week we decided to check out one of the local parks and we found a picnic table that was isolated and we enjoyed being out.....

To-Do Tuesday for week of July 28 through August 3:
  1. I am in a FB quilt challenge to enter a quilt every day so I will finish those entries.  
  2. Document my quilts in a notebook of these 10 quilts. (Most of my information is in my blog and that is where I go whenever I need to repeat something or someone asks about a quilt.)
  3. Work on my ongoing quilt projects every day.
I am linking to Roseanne's 

Be sure to see what everyone else is doing and join in the fun!!

Smiles and hugs....Caryl

Tuesday, July 21, 2020

To-Do Tuesday #27

My 27th week of linking to Home Sewn By Us for To-Do Tuesday

Here is my progress from last week

To-Do Tuesday for the week of July 14 through July 20:
  1.  Spend every day on sewing/quilting project.  I will be hand sewing the binding on the yellow brick road a little each day.  Also sewing more scrappy rectangle blocks....and probably some other quilt projects. yes
  2. FMQ practice or a project 4 days this week. yes
1  I worked on hand binding usually on the patio first thing in the morning when it was cool in the 60s....also other times during the day and evening.

I finished two more blocks of scrappy rectangles and worked on blocks from some other projects.
I made another mask from a different pattern. I used the CDC tutorial posted on TQS site

2 I did FMQ using the BSR foot, the ruler foot and the walking foot.  Here is the dolphin runner where I am using the walking foot and moving the runner back and forth to create a wavy line.  I decided to go back and cross some of the lines and that is what I will add next.


To-Do Tuesday for the week of July 21 through July 27:
  1. Finish quilting the dolphin runner
  2. Make the last block of the scrappy rectangle quilt
  3. Do online class lessons at least 4 days

I am linking to Roseanne's 


Be sure to see what everyone else is doing and join in the fun!!

Smiles and hugs....Caryl